97 result(s) for bkk tickets
Weekend Metro Replacement On Budapest Metro Line M3
- 17 Jul 2014 10:40 AM
- getting around
Due to refurbishment works at July weekends, metro line M3 runs on a shortened route between Kőbánya-Kispest and Nagyvárad tér. Replacement buses M3 are in operation between Újpest Központ and Nagyvárad tér. The change has a slight effect on the timetable of bus 200E to Liszt Ferenc International Airport.
Heritage Public Transport Services In Budapest In July 2014
- 16 Jul 2014 9:00 AM
- getting around
On July weekends special heritage transport services are offered this year again.
Heritage tramway service:
Turn back time by riding the hundred-year-old tramcars along the most beautiful sights of the Hungarian capital and feel the original atmosphere of late 19th-century Budapest. There is an outstanding view from the route to admire the sights like the Buda Castle, the Fisherman’s Bastion ...
New Surface Transport Network Following Start Of Metro Line M4 On 29 March 2014
- 28 Mar 2014 8:02 AM
- getting around
According to the announcement by Budapest Mayor István Tarlós passengers will be able to start using metro line M4 from 12:00 noon on Friday, 28 March 2014. The new metro line will be operating until the last scheduled departures on Friday while the surface transport network will remain unchanged: buses will be operating based on their current schedules and routes until the following day; the new ...
Price Cut In Budapest Public Transport – BKK Passes Cost 10% Less
- 9 Jan 2014 10:45 AM
- getting around
The General Assembly of Budapest approved the motion for BKK’s public transport pass prices to be decreased by 10% from 1 January 2014. Costs of the most frequently purchased pass types required for daily commutes to work and school will be reduced.
Budapest Airport Signs Historic Agreement With BKK
- 16 Dec 2013 8:00 AM
- getting around
The leaders of Budapest Airport and the Budapest Transport Center (BKK) have signed a historic cooperation agreement that aims to improve all areas of ground transportation services to and from the airport. The document brings ground transportation services in line with the changes that have taken place in recent months in the city of Budapest.
Replacement Buses Will Be In Service On Metro Line M2 In Budapest
- 18 Oct 2013 9:01 AM
- getting around
The last phase of the refurbishment project of metro line M2 is the replacement of the signalling system which has been in operation for more than 40 years. The prerequisite of the installation of the new, computer-controlled and modern equipment was the entering into service of the entire Alstom train fleet.
Due To Refurbishment Works, Tram Line 61 In Budapest Runs On A Shortened Route
- 2 Oct 2013 9:00 AM
- getting around
Tram line 61 runs on a shortened route between Móricz Zsigmond körtér and Zuhatag sor from 28 September 2013 (Saturday) to 31 October 2013 (Thursday) due to the entire renovation of the bridge’s retaining walls situated at Zsemlye utca-Nagyhíd stop as well as the refurbishment of the 700 metre-long tracks between Vadaskerti út and Nyéki út in Völgy utca which are currently in an extremely bad ...
Tram Line 1 Track Refurbishment Starts In Budapest
- 2 Oct 2013 8:00 AM
- getting around
Track refurbishment on tram line 1 begins on Saturday, 28 September 2013. The first phase of the more than two-year-long development project concerns the section of the tram route between Bécsi út and Lehel utca, and involves the modernisation of stops and the upgrade of the power supply and signalling systems.
Tickets Available On Board More Public Transport Vehicles In Budapest
- 24 Sep 2013 9:00 AM
- getting around
On the basis of the decision by BKK’s CEO, bus lines serving the Buda Castle along with a few other transport lines will join the range of vehicles where tickets are on sale on board from the driver. On bus lines 16, 16A and 116 popular with tourists for reaching the castle as well as on tram line 69, single tickets are available at the price of HUF 450.
Weekend Metro Replacement On Budapest Metro Line M3
- 17 Jul 2014 10:40 AM
- getting around
Due to refurbishment works at July weekends, metro line M3 runs on a shortened route between Kőbánya-Kispest and Nagyvárad tér. Replacement buses M3 are in operation between Újpest Központ and Nagyvárad tér. The change has a slight effect on the timetable of bus 200E to Liszt Ferenc International Airport.
Heritage Public Transport Services In Budapest In July 2014
- 16 Jul 2014 9:00 AM
- getting around
On July weekends special heritage transport services are offered this year again.
Heritage tramway service:
Turn back time by riding the hundred-year-old tramcars along the most beautiful sights of the Hungarian capital and feel the original atmosphere of late 19th-century Budapest. There is an outstanding view from the route to admire the sights like the Buda Castle, the Fisherman’s Bastion ...
New Surface Transport Network Following Start Of Metro Line M4 On 29 March 2014
- 28 Mar 2014 8:02 AM
- getting around
According to the announcement by Budapest Mayor István Tarlós passengers will be able to start using metro line M4 from 12:00 noon on Friday, 28 March 2014. The new metro line will be operating until the last scheduled departures on Friday while the surface transport network will remain unchanged: buses will be operating based on their current schedules and routes until the following day; the new ...
Price Cut In Budapest Public Transport – BKK Passes Cost 10% Less
- 9 Jan 2014 10:45 AM
- getting around
The General Assembly of Budapest approved the motion for BKK’s public transport pass prices to be decreased by 10% from 1 January 2014. Costs of the most frequently purchased pass types required for daily commutes to work and school will be reduced.
Budapest Airport Signs Historic Agreement With BKK
- 16 Dec 2013 8:00 AM
- getting around
The leaders of Budapest Airport and the Budapest Transport Center (BKK) have signed a historic cooperation agreement that aims to improve all areas of ground transportation services to and from the airport. The document brings ground transportation services in line with the changes that have taken place in recent months in the city of Budapest.
Replacement Buses Will Be In Service On Metro Line M2 In Budapest
- 18 Oct 2013 9:01 AM
- getting around
The last phase of the refurbishment project of metro line M2 is the replacement of the signalling system which has been in operation for more than 40 years. The prerequisite of the installation of the new, computer-controlled and modern equipment was the entering into service of the entire Alstom train fleet.
Due To Refurbishment Works, Tram Line 61 In Budapest Runs On A Shortened Route
- 2 Oct 2013 9:00 AM
- getting around
Tram line 61 runs on a shortened route between Móricz Zsigmond körtér and Zuhatag sor from 28 September 2013 (Saturday) to 31 October 2013 (Thursday) due to the entire renovation of the bridge’s retaining walls situated at Zsemlye utca-Nagyhíd stop as well as the refurbishment of the 700 metre-long tracks between Vadaskerti út and Nyéki út in Völgy utca which are currently in an extremely bad ...
Tram Line 1 Track Refurbishment Starts In Budapest
- 2 Oct 2013 8:00 AM
- getting around
Track refurbishment on tram line 1 begins on Saturday, 28 September 2013. The first phase of the more than two-year-long development project concerns the section of the tram route between Bécsi út and Lehel utca, and involves the modernisation of stops and the upgrade of the power supply and signalling systems.
Tickets Available On Board More Public Transport Vehicles In Budapest
- 24 Sep 2013 9:00 AM
- getting around
On the basis of the decision by BKK’s CEO, bus lines serving the Buda Castle along with a few other transport lines will join the range of vehicles where tickets are on sale on board from the driver. On bus lines 16, 16A and 116 popular with tourists for reaching the castle as well as on tram line 69, single tickets are available at the price of HUF 450.