112 result(s) for replacement bus
Due To Refurbishment Works, Tram Line 61 In Budapest Runs On A Shortened Route
- 2 Oct 2013 9:00 AM
- getting around
Tram line 61 runs on a shortened route between Móricz Zsigmond körtér and Zuhatag sor from 28 September 2013 (Saturday) to 31 October 2013 (Thursday) due to the entire renovation of the bridge’s retaining walls situated at Zsemlye utca-Nagyhíd stop as well as the refurbishment of the 700 metre-long tracks between Vadaskerti út and Nyéki út in Völgy utca which are currently in an extremely bad ...
Tram Line 1 Track Refurbishment Starts In Budapest
- 2 Oct 2013 8:00 AM
- getting around
Track refurbishment on tram line 1 begins on Saturday, 28 September 2013. The first phase of the more than two-year-long development project concerns the section of the tram route between Bécsi út and Lehel utca, and involves the modernisation of stops and the upgrade of the power supply and signalling systems.
Hungary's SMEs Are Failing To Prepare For The Future
- 18 Sep 2013 10:00 AM
- specials
Succession planning is a growing concern for all business. However, it’s Hungary’s SME sector which is failing to prepare for the future as worries about cost, wasted time and internal politics are all causing major stumbling blocks.
Southern Section Of The Pest-Side Quay Closed For Two Weeks Due To Reconstruction
- 12 Aug 2013 4:00 AM
- getting around
The Salkaházi Sára rakpart, the Pest-side quay between Szabadság híd (Liberty Bridge) and Közraktár utca, is being reconstructed due partly to the M4 station construction works and to the damages caused by the recent floods. The Salkaházi quay will be closed to traffic for the period of the works starting on Saturday 3 August 2013 and lasting for about two weeks. BKK suggests Belgrád rakpart, ...
Southern Section Of The Pest-Side Quay Closed For Two Weeks Due To Reconstruction
- 12 Aug 2013 4:00 AM
- getting around
The Salkaházi Sára rakpart, the Pest-side quay between Szabadság híd (Liberty Bridge) and Közraktár utca, is being reconstructed due partly to the M4 station construction works and to the damages caused by the recent floods. The Salkaházi quay will be closed to traffic for the period of the works starting on Saturday 3 August 2013 and lasting for about two weeks. BKK suggests Belgrád rakpart, ...
Take BKK’s Public Transport Services To Sziget Festival In Budapest
- 5 Aug 2013 9:03 AM
- getting around
The 21th Sziget Festival will be held on Óbuda Island from Monday 5 August to Monday 12 August 2013. Thanks to the agreement between Sziget and BKK Centre for Budapest Transport, special CityPASS wristbands will go on sale entitling holders to public transport and other special services during the event. Furthermore, we are launching special dedicated transport services and provide higher ...
Updated On 18 June At 3 pm: Traffic Changes In Budapest Due To Danube Flooding
- 18 Jun 2013 3:00 AM
- getting around
The sections of the lower Pest embankment between Lánchíd (Chain Bridge) and Közraktár utca as well as between Dráva utca and Jászai Mari tér are reopened from 22:00 on 17 June 2013, thus only the section between Jászai Mari tér and Lánchíd remains closed during the construction carried out at the underground car park of the Parliament.
Traffic Changes In Budapest Due To Danube Flooding - 14 June Noon
- 14 Jun 2013 10:10 AM
- getting around
Upper embankment roads are reopened to road traffic – flood traffic update summary. On 11 June 2013, Budapest Mayor István Tarlós ordered BKK, Municipal Disaster Management, Budapest Sewage Works, Budapest Transport Company BKV and the Budapest Police to jointly assess the situation at Batthyány tér and decide on how to alleviate the traffic restrictions affecting Budapest residents in line with ...
Updated on 14 June 8 pm: Traffic Changes In Budapest Due To Danube Flooding
- 14 Jun 2013 8:00 AM
- getting around
Upper embankment roads are reopened to road traffic – flood traffic update summary:
After the technical assessment by BKK and BKV professionals suburban railway H5 runs on its full route to Batthyány tér terminus from 12:00 noon on 14 June 2013 and the service of replacement bus H5 is suspended. Suburban railway H5 runs from Békásmegyer/Szentendre to Batthyány tér according to its regular ...
Due To Refurbishment Works, Tram Line 61 In Budapest Runs On A Shortened Route
- 2 Oct 2013 9:00 AM
- getting around
Tram line 61 runs on a shortened route between Móricz Zsigmond körtér and Zuhatag sor from 28 September 2013 (Saturday) to 31 October 2013 (Thursday) due to the entire renovation of the bridge’s retaining walls situated at Zsemlye utca-Nagyhíd stop as well as the refurbishment of the 700 metre-long tracks between Vadaskerti út and Nyéki út in Völgy utca which are currently in an extremely bad ...
Tram Line 1 Track Refurbishment Starts In Budapest
- 2 Oct 2013 8:00 AM
- getting around
Track refurbishment on tram line 1 begins on Saturday, 28 September 2013. The first phase of the more than two-year-long development project concerns the section of the tram route between Bécsi út and Lehel utca, and involves the modernisation of stops and the upgrade of the power supply and signalling systems.
Hungary's SMEs Are Failing To Prepare For The Future
- 18 Sep 2013 10:00 AM
- specials
Succession planning is a growing concern for all business. However, it’s Hungary’s SME sector which is failing to prepare for the future as worries about cost, wasted time and internal politics are all causing major stumbling blocks.
Southern Section Of The Pest-Side Quay Closed For Two Weeks Due To Reconstruction
- 12 Aug 2013 4:00 AM
- getting around
The Salkaházi Sára rakpart, the Pest-side quay between Szabadság híd (Liberty Bridge) and Közraktár utca, is being reconstructed due partly to the M4 station construction works and to the damages caused by the recent floods. The Salkaházi quay will be closed to traffic for the period of the works starting on Saturday 3 August 2013 and lasting for about two weeks. BKK suggests Belgrád rakpart, ...
Southern Section Of The Pest-Side Quay Closed For Two Weeks Due To Reconstruction
- 12 Aug 2013 4:00 AM
- getting around
The Salkaházi Sára rakpart, the Pest-side quay between Szabadság híd (Liberty Bridge) and Közraktár utca, is being reconstructed due partly to the M4 station construction works and to the damages caused by the recent floods. The Salkaházi quay will be closed to traffic for the period of the works starting on Saturday 3 August 2013 and lasting for about two weeks. BKK suggests Belgrád rakpart, ...
Take BKK’s Public Transport Services To Sziget Festival In Budapest
- 5 Aug 2013 9:03 AM
- getting around
The 21th Sziget Festival will be held on Óbuda Island from Monday 5 August to Monday 12 August 2013. Thanks to the agreement between Sziget and BKK Centre for Budapest Transport, special CityPASS wristbands will go on sale entitling holders to public transport and other special services during the event. Furthermore, we are launching special dedicated transport services and provide higher ...
Updated On 18 June At 3 pm: Traffic Changes In Budapest Due To Danube Flooding
- 18 Jun 2013 3:00 AM
- getting around
The sections of the lower Pest embankment between Lánchíd (Chain Bridge) and Közraktár utca as well as between Dráva utca and Jászai Mari tér are reopened from 22:00 on 17 June 2013, thus only the section between Jászai Mari tér and Lánchíd remains closed during the construction carried out at the underground car park of the Parliament.
Traffic Changes In Budapest Due To Danube Flooding - 14 June Noon
- 14 Jun 2013 10:10 AM
- getting around
Upper embankment roads are reopened to road traffic – flood traffic update summary. On 11 June 2013, Budapest Mayor István Tarlós ordered BKK, Municipal Disaster Management, Budapest Sewage Works, Budapest Transport Company BKV and the Budapest Police to jointly assess the situation at Batthyány tér and decide on how to alleviate the traffic restrictions affecting Budapest residents in line with ...
Updated on 14 June 8 pm: Traffic Changes In Budapest Due To Danube Flooding
- 14 Jun 2013 8:00 AM
- getting around
Upper embankment roads are reopened to road traffic – flood traffic update summary:
After the technical assessment by BKK and BKV professionals suburban railway H5 runs on its full route to Batthyány tér terminus from 12:00 noon on 14 June 2013 and the service of replacement bus H5 is suspended. Suburban railway H5 runs from Békásmegyer/Szentendre to Batthyány tér according to its regular ...